WHY GO MODULAR ?
Save Time, Control Costs & Build Quality!
Save Time
- Work is never delayed by weather, subcontractor
no-shows or missing material.
- Entire process can take as little as four months.
- Ground-breaking to occupancy can take as little as
10 weeks.
- Most modular buildings can be fully set on-site in
as little as one day and weather-tight in as little as
two days, depending on the size of the structure.
Control Costs
- Cost is generally less than stick-built construction.
- Locked-in price at the beginning of the project.
- Construction loan savings due to site and utility preparation being done concurrently
with construction.
- Energy efficiency saves homeowner on heating and cooling costs.
Built Quality
- 30% more material used than conventional site-built
homes.
- Lumber is never exposed to outdoor elements which
ensures no warping, no moisture and no bugs.
- Our modular homes are strengthened by these
construction techniques:
Build Quality
- Separate first-story ceiling and second-story floor
systems on two-story homes.
- Floor sheathing glued and nailed.
- Double or triple perimeter joists used at marriage
walls.
- Modules joined together at marriage wall with bolts
in basement and attic.
- Extra strapping on interior of exterior walls.
- Independent third-party testing agency for quality
control and code compliance.